Conical Shape ETP Design, Ananta Apparels Limited
ETABS 22.5.0 This is mainly the newly constructed ETP at …
Find recent posts from Engr. Aditya Dev
ETABS 22.5.0 This is mainly the newly constructed ETP at …
Crack Investigation [OCTOBER 2026] · ETABS 22.5.0 The Approved Crack Investigation Re…
ETABS 22.5.0 Design Parameters Parameter Value …
ETABS 22.5.0 This project involves the structural analysis and design of a low-rise reinforce…
ETABS 22.5 I have successfully carried out the structural design and Engineering Assessment …
· ETABS 22.5 I have successfully carried out the structural design and Detail Engineerin…
Project Overview The July Uprising Commemoration Museum, located at Gonobhaban , Sher-Bangla Nagar, Dhaka, is a historically significant project ai…
The Connecting Stair construction was carried out to provide safe and permanent access to the overhead water tank structure at Centre for the Rehabil…
As part of sustainable water management initiatives at the Centre for the Rehabilitation of the Paralysed (CRP), the C-11 project involved constructi…